Activity Summary
The development of house construction
Today, on 3 April , 2021, as the person in charge of the field, in the construction of the Steem House for Steemians named @tailah.bayu, I would like to provide the stages of work that I did together with construction workers, supported directly by additional workers from @aceh-team, who lives in the city of lhokseumawe and several districts in North Aceh.
In achieving the construction work of this house, I wish all Steemians Steemit to know the progress based on the post "Plan 1", to the achievements in the previous "Plan 2" post.
In this post, I will share the journey of building a house
Hopefully the purpose of building this house will become one of the biggest promosteem in building the Steem Blockchain Network, to bring in special investors for house construction, for all the people of Aceh-Indonesia who are members of Steemit and the Steem Community. house construction, for the people of Aceh-Indonesia. @tailah.bayu.
The picture below shows a house that will be replaced with a new house that is currently under construction.
Main Road to New House
Tonight, I will show all of you, the life journey of a Steemit user, in his daily life, waiting for his house to be completed, using assistance funds from Steemit.
I am the person in charge of building this house, here is the location and the road that I walk every day with all the people who help with the construction of the house as well as members of the Aceh-team, the obstacles on this trip are what hampered the traffic of delivering building materials for the last few weeks. then.
you can see it in the first image below.
if you look at the picture above, my position is down, and in the middle, if you look at the picture below, we are heading towards building a house. the road conditions to climb.
in this climbing position, we use two-wheeled vehicles and cars, to get to our destination.
picture the position distance from the trip image from the picture above.
In the picture above, that is the actual state of the road, leading to a house that is under construction, but with great enthusiasm, this happened thanks to your support.
Road Constraints Toward House Construction
Below, are my first experiences, on the road to Housing Construction, hoping to bring all the building materials I need, but some obstacles occurred in the field accidentally.
As you will see below, 1 unit of a car transporting house construction materials is stuck in the middle of the road to the house construction site, with a standard sand load, but makes the soil condition, unable to withstand a very heavy load.
Thus, car tires can no longer rotate, so they stop, because, an auto part of the tire has been broken, you can see it, in the last picture below later.
let's see, the whole picture below :
Like the picture you have seen above, that's the condition.
next ....
so that the same thing does not happen again, and to avoid other things from happening, which could hinder the construction of the house, we agreed to fill a section of the road with some heaps of earth, so that the road we are going to can run smoothly.
below, the road that had not previously been buried with soil, we finished working on it, by filling it with soil and leveling the body of the road, so that it could be traversed throughout their lifetime, by the @tailah.bayu family and siblings.
Home Construction Location
The following is the location for building a house, which will be built for the family @tailah.bayu. let's look at the first image below, so that we can both know the conditions and place of construction of the @tailah.bayu house.
Checking the place and location of the house.
Several members of @aceh-team, such as @grisaia-steem - @digitals-photo and @adi.pisces, checked the location of the house to be built.
and after this checking is carried out together, then all the materials for the construction of the house are brought to this place.
HOUSE BUILDING MATERIALS
In this section, I would like to show all the materials that have been purchased, with some details and invoices, which are in the calculation stage, so that the information is clearer.
materials, for the needs of building houses, I ordered from various providers, always constrained, because of the long distance, so that the cost to be paid was very expensive, so the other alternative I did was, cooperate with several shops that sell building materials, so that in its implementation, there are no obstacles in the field, such as the conditions you have seen above.
What building materials have arrived at the location where the house was built, let's look at it below :
Sand
You can see the picture below
Foundation Stone
You can see the picture below
Brick
You can see the picture below
Adhesive Cement
You can see the picture below
Iron pole and foundation
You can see the picture below
WORK PHASE 1
As you can see above, those are the building materials, which are ready to be used to build a house, for @tailah.bayu.
Below, all of you will see developments in house construction, in the image below you will see the arrangement of images gradually, in the ongoing construction process, to this day, to be precise on April 3, 2021.
In this arrangement of pictures, I feed it so that every house building process is stronger and more durable, for a long period of time, and takes into account the original atmosphere of the field, as time goes on, until the house under construction is quickly finished this week. and can immediately be occupied by @tailah.bayu and family, before the holy month of Ramadan.
The cement continued to be stirred and the boulder was assembled.
let's look at the arrangement of the image below.
WORK PHASE 2
WORK PHASE 3
WORK PHASE 4
The construction of houses was stopped, because it was already late in the evening, the people who built the house along with the house construction supervisor, took turns cleaning themselves, from dust and cement, and subsequently, in preparation for returning to their respective homes, and from all activities, and continued again tomorrow.
let's look at the image below
WORK PHASE 5
To be continued Tomorrow ................. Because the day has come is approaching evening - night.
COST DETAILS
1 . DONATION WITHDRAWAL DETAILS
2 . WITHDRAWAL DETAILS
3 . Details of the Provisional Development Budget
4 . Proof of Purchase - Invoice
Information :
All Cost Details, are in total calculation, and will be notified, in the next post, this is because the construction process is still ongoing tomorrow.
Hello Steemians All, I hope you have seen it, the overall progress in the construction of this house, through the picture above, hopefully in the next few days, this house, is ready to be occupied by our brother @tailah.bayu.
I represent @sultan-aceh and members of the Aceh Team, @WorldOf Xpilar community, to convey thousands of thanks, to those who have supported all of these activities, both in the real world, online, enthusiastic support, and prayers.
Requesting assistance from:
- Team Steemit
- @steemitblog
- @steemitcurator01
- @jondoe
- @upvu
- @stephenkendal
- @crypto.piotr
- @italygame
- @axeman
- @nutbox.mine
- @girolamomarotta
- @xeldal
- @enki
- All home-building investors
- All steem investors
- All Steem users.
Hopefully this project submission will receive support from all parties.
This is what I can say, for the time being, ahead of tomorrow's next process.
Hilsen
@sultan-aceh
Responsible Field - Vote from Home - House in Progress
World Of Xpilar community
100% Voting this post to @tailah.bayu
The results of 100% voting on this post will be given to @tailah.bayu and @tailah.bayu, which will be used for the cost of building houses and the purchase of subsequent building materials.
Hilsen
@sultan-aceh
Responsible Field - Vote For Home - Be Real Steemian
World Of Xpilar community
New Donations Round Three - Vote For Home - Progress
List - Vote For Home - Progress | STEEM | SBD |
---|---|---|
1. @bippe | 250 | - |
2. @dobartim | 100 | - |
New Donations Round Two - Vote For Home - Progress
List - Vote For Home - Progress | STEEM | SBD |
---|---|---|
1. @bigpower | 100 | - |
2. @hingsten | 100 | - |
3. @stephenkendal | 100 | - |
4. @xpilar | 80 | - |
5. @girolamomarotta | 50 | - |
6. @dobartim | 50 | - |
7. @jasonmunapasee | 20 | - |
8. @partner-macro | - | 2 |
9. @belkanca | 8.326 | - |
10. @humaidi | - | 1 |
11. @taillah | - | 1 |
12. @ajirsalem | - | 1 |
13. @zubir-steem | - | 1 |
Total | 508.326 | 7 |
Donation List
List- Name Days 1 | STEEM | SBD |
---|---|---|
1. @xpilar | - | 25 |
2. @dobartim | 100 | - |
3. @stephenkendal | 100 | - |
4. @italygame | 100 | - |
5. @art-venture - @stef1 and @myskye | 100 | - |
6. @adeljose | - | 7 |
7. @vipnata | 20 | - |
8. @worldofxpilar | - | 1.433 |
9. @jasonmunapasee | - | 3 |
10. @digitals-photo | - | 2 |
11. @digitals-world | 5 | 1 |
12. @adi.pisces | - | 2 |
13. @grisaia-steem | - | 2 |
14. @ummamah | - | 2 |
15. @umar-k | 10 | - |
16. @rafka90 | - | 2 |
17. @partner-macro | - | 2 |
18. @doodleman | 3.486 | - |
19. @belkanca | - | 5.066 |
20. @ammacrophoto | - | 2 |
21. @lensa-macro | - | 2 |
22. @sa1photography | - | 1 |
23. @adivender | - | 1 |
23. @lensaphoto | - | 1 |
24. @sultan-aceh | - | 10 |
Total | 438.486 | 71.499 |
List- Name Days 2 | STEEM | SBD |
---|---|---|
1. @hingsten | 154.990 | - |
2. @reflektor | - | 10 |
3. @bigpower | - | 10 |
4. @bippe | - | 10 |
Total | 154 | 30 |
Note :
Donations can be sent to the wallet @sultan-aceh address, and will be sent directly to @taillah.bayu and family.
Management
1 | Responsible Fields | @sultan-aceh |
---|---|---|
2 | Treasurer for Development | @jasonmunapasee |
3 | Checking Assistance Fund Transactions | @grisaia-steem |
4 | Field Inspectors | @digitals-photo |
5 | Information and Documentation | @adi.pisces |
6 | Implementation with | Members @aceh-team |
Development Information
House | @tailah.bayu |
---|---|
Location | Cot Murbo 1 - Kecamatan Kuta Makmur - Aceh Utara |
Support | @dobartim - @stephenkendal @xpilar and Team Norway |
Survei | Community @worldofxpilar - @aceh-team and @sultan-aceh |