I was not expecting so many people to view the first post but thank you to everyone that did, and if you missed it here is the link!
My first home - Concept to completion part 1 (Exterior)
I thought I was going to work on part 2 during the week and look through my albums for pictures that I took previously, but since I had time this morning I decided to take complete new ones! Just a heads up, there are A LOT of pictures.
I'll start off this blog the same as the last one. Here are conceptual drawings of the interior. The goal was to have the inside match the outside in terms of style. I think we did pretty well.
View from the living room towards the staircase
Fire place and hearth
Kitchen and appliances
Dining room
Ensuite
Since this was a construction site I was not allowed in without the site supervisor with me. These are the pictures I was able to take during construction. I wish I had the chance to take more.
A view from the basement landing going up the stairs
The open riser stairs installed
Fire place and what will later become the hearth
Half of the kitchen cabinets installed
The staircase view from the living room
A view from the top floor looking down
The glass templates
Tiles installed on the fireplace
The carpet installation in the master bedroom
Ensuite
The light fixture we ordered from Germany!
Now for the good stuff. I took all these pictures this morning, and I attempted to take some at the same angles I did during construction. I also included a little sign in the pictures that I could. See if you can spot it. :)
A view from the basement landing going up the stairs
Fire place and hearth from one angle
Fire place and hearth from another angle
The staircase view from the living room
Finished kitchen
Dining room
Master bedroom
The ensuite
and of course I had to include a few pictures of the light fixture installed at the top of the staircase.
I hope everyone enjoyed both parts! If you have any questions of comments leave some replies for me. I'll do my best to answer all of them.
Thanks for looking!