On the job with silverd510....

Hello my fellow steemians......

Today is the first sunny day in what seems like weeks here. I’m on an install today of another one of my projects.

So today I’m going to share the on the job look at an install for you. Trying to take pictures of the work with so many different contractors here wasn’t easy. Had an electrician, plumber, and two granite guys all following right behind me as I was done in each area.

The job is a custom solid cherry bar. The bar is a fully operational wet bar, with vinotemp, mini frig and working sink. There is a built in corner cabinet unit behind the bar for storage as well. Across from the bar is a trophy cabinet that I built into a closet to match.

The family that contracted me for this job are owners of racing horses and wanted to be able to show off their trophies.

Here is the front view of the bar. Inside the arched fluted styles that I made will be hand blown glass tiles with a built in LED light system.

9813D2C7-04B6-4CA6-AC8A-13EFF1FF3458.png

F96E2B04-3AFE-4814-A043-2B5CF7D93152.png

He are the views from behind the bar.

DD396546-6D2C-41BD-91CE-E01D34AA3DC4.jpeg

8238EF1B-0295-463D-AB25-2B2D9BCA4DD5.jpeg

This is the corner cabinet behind the bar. It will have three smoked glass shelves shortly.

CCED90F5-7D9C-4314-838A-9E156B001023.jpeg

The trophy case across from the bar. It is set into what was an old closet.

F72A8787-FD6A-4F77-9B1A-614A58529AEE.jpeg

Hope you enjoyed the post.

Thank you for viewing


854A8E32-847F-40A9-81D8-3B294AB11D33.png

30E6FAF9-F5D8-4DDC-949D-53C8FA56A2EA.png

H2
H3
H4
3 columns
2 columns
1 column
17 Comments